 |

| |
| Scope |
 |
Feasiblity Study |
 |
Preliminary Engineering |
 |
Infrastructure Survey |
 |
Logistics Plan |
 |
EPC Bid Packages |
| |
| Facilities |
 |
1,041 km, 30-inch diameter onshore pipeline |
 |
11 km, 30-inch offshore pipeline and a floating storage and off loading (FSO) vessel. |
 |
Four, 12,000 hp pumping stations |
 |
One pressure reducing station |
|