 |

| |
| Scope |
 |
Preliminary Engineering |
 |
Detailed Engineering & Design |
 |
Procurement Services |
| |
| Facilities |
 |
12 Station retrofits that included the addition of 350,000 HP of gas turbine compression |
 |
Station piping, control and automation systems |
 |
725 miles of 42-inch and 110 miles of 36-inch loops |
 |
25 directionally drilled river crossings, 10 railroad crossings, 23 major highway crossings |
|