| Scope |
 |
Engineering |
 |
Feasibility/Economic Study |
 |
Design/Drafting Services |
| |
| Facilities |
 |
Expansion and modification of 5 existing pump stations (additional 70 MW installed) |
 |
Construction of 10 new pump stations (approximately 225 MW pumping installed)
|
 |
Replacement of 88 km's of existing pipeline |
 |
Addition of six 100,000 MW storage tanks at shore terminal. |
 |
SCADA Communication and Controls |
 |
Installation of the third Single Point Mooring buoy |
 |
New maintenance and operational facilities |